This phase of the design relied on a crane to hoist the transformer out of the second story balcony. The main doors of studio were far too small to transport the structure out and instead the locked balcony doors were opened for the operation. The project was loaded onto the flat bed trailer straight from the second floor.

The success of this phase allowed us to focus and prepare thoroghly for the main transformers event the next day.